Port of Barcelona, Spain

Works management and quality control 

Within a framework agreement with the Port of Barcelona, Prointec develops the works management and the quality control of all works in this area, implemented within the Port’s domain, during a given period of time, corresponding to the contract term. 

Main works developed by Prointec: 

Urbanization.

  • Accesses control ZLA Prat (Cal Malet).
  • Demolition of the shed on Poniente Wharf.
  • Road network planning Zone III (Urbanization Costa Wharf)
  • Urbanization Barcelona Wharf.
  • Urbanization of plot located in C/ÁLVAREZ de la Campa
  • New maritime signaling on the East dock.
  • Urbanization of the maritime terminal D extension.
  • Plot preparation on the free zone.
  • Roundabout in Ronda del Port to improve accesses to Estibarna and the Autoterminal.
  • Embarkation gateway connection between stations B and C.
  • Services connections of the ice factory and the fish market.
  • Electrification of Prat Wharf (North area)
  • Improvements of the sanitation network around the new mouth.
  • Shelters remodeling in Adossat Wharf.
  • Renovation of the electrical installation in section 5, TIR trucks parking, section 4 and second breakwater Wharf, adjustment to the REBT.
  • Lighting of the railway terminal section 6. Phase I.
  • Public lighting improvement of the Paseo Juan de Borbón and the Port Vell.
  • Lighting improvement of the Adossat Wharf and the East breakwater.

Maritime works

  • Extension of the turning area in the South Wharf terminal.
  • Repairs in the berthing area Prat Wharf (North area).
  • Construction of three new bollards at the Adossat Wharf.
  • Container terminal Prat Wharf (phase 2). Not concessioned area. Turning area. 
  • Repair of ro-ro ramp between the Costa Wharf and the North second breakwater Wharf. Phase 1.
  • Adjustment and protection of the South Poniente Wharf.
  • Adjustment and protection of the Evaristo Fernández Wharf.
  • Adjustment and protection of the Wharf (Morrot and San Beltran docks stabilization).
  • Renovation of Lepanto Wharf.
  • Wharf Maritime Station F. Filling.
  • Extension of Adossat Wharf 2nd phase B (multipurpose terminal).
  • Civil works new syncrolift Cataluña Wharf.

Railway works

  • Extension of the railway terminal South Wharf. Phase II B
  • Rail access in Iberian and UIC gauges to the Bergé shed.
  • Adjustment of the South header of the loading and unloading railway terminal of Prat Wharf.
  • Extension of the railway terminal Principe de España. Phase 1
  • Adjustment of railway intersections.
  • New railway access. Access and dispatch/receipt tracks.
  • Extension of the railway terminal South Dock.

Road network works

  • New accesses of the South extension. Preload of phase 1C.
  • Improvement of road connection to extension zones of the Prat Wharf and the Energía Wharf.
  • Refurbishment of the Port roundabout. Campaign 2014.
  • New accesses to the South extension. Phase 1B and 1C.
  • Renovation of access controls of the ZLA Prat and ZLA Barcelona.
  • Urbanization of the Port roundabout. Section 4 (Bunge). Phase 1